The Final Punchlist (About One More Week!)


I’ve very thrilling information! The counter tops within the rest room shall be put in on MONDAY! I’m so excited. I really feel like a child on Christmas Eve. I imply, this rest room venture has been happening for therefore lengthy now (a truth for which I make no apologies contemplating that Matt and I finally have a life outside of our house now after over a decade, and we’re each having fun with it to the fullest), however the set up of the counter tops will actually really feel like this venture is formally winding down.

So I went again to the final “to do” listing that I made for this rest room to see simply how far I’ve come, and precisely what nonetheless must be carried out. I initially made the listing in April, after which I reevaluated the listing in July and checked off a number of issues that I had gotten carried out by then. And right here’s the state of the listing now…

  1. End the crown molding and trim across the mural wall — sand, caulk, prime, and paint (Completed!)
  2. Set up the final row of tiles across the ceiling within the bathe (Completed!)
  3. Set up the door between the lavatory and residential health club (Completed!)
  4. Trim out that door (Completed!)
  5. Construct two vanities (Completed!)
  6. Construct the “dresser” between the vanities (Completed!)
  7. Make the “chandelier” and set up above the bath (Completed!)
  8. Construct the cupboard for the bathroom space (Completed!)
  9. Paint the partitions and ceiling in the bathroom space (Completed!)
  10. Set up baseboards in the bathroom space — caulk, prime and paint (Completed!)
  11. Have the bath, tub faucet, and bathroom put in (Completed!)
  12. Cling bathe curtain within the bathe (Completed!)
  13. Order counter tops for vanities (Completed!)
  14. Have the sinks put in (Will likely be carried out on Monday)
  15. End the plumbing on the sinks (Hopefully shall be carried out on Monday)
  16. Set up the wainscoting on the decrease partitions (In progress!)
  17. End the entire remainder of the trim (doorways, window, wainscoting) — wooden fill, sand, caulk, prime, and paint
  18. Cling the opposite self-importance mirror
  19. Resolve on privateness (window therapies? glass movie?) for the window and doorways (Completed!)

Right here’s what all the pieces seems to be like going into this weekend, and as I rely down this closing few days of engaged on this rest room venture.

The bathe has been largely carried out for some time now. It’s completely useful as it’s, however I nonetheless must hem the bathe curtains in order that they’re not puddling on the ground.

And all the pieces must be cleaned, clearly. The ground isn’t that brown. That’s simply mud. 😀 There’s a coating of mud on all the pieces on this room, so all the pieces must be cleaned.

In the principle space, I’m actually right down to wainscoting (which can embody a tile accent) and trim. And as soon as I lastly get the door painted and get that plastic off of the glass panes, I’ll be including privateness movie to the glass on each doorways within the room.

Then there are the smaller particulars, like putting in sconce shades, hanging the opposite mirror, putting in change plates and outlet covers, and so forth.

The drawers on the storage cupboard nonetheless want a second sanding and a second coat of Rubio Monocoat. The perimeters of the cupboard and the vanities have already been carried out.

The bathroom space is completed. It simply must be cleaned rather well because it additionally has a coating of mud on all the pieces.

And I must get the vent cowl on the A/C vent within the ceiling.

On the opposite facet, I don’t have fairly as a lot carried out on the wainscoting, however at the least there’s a little bit of progress.

And when you can’t see it, I would like to vary the trim on the flooring behind the bath. I had initially used a daily shoe molding, however after I was engaged on the water closet, I made a decision that shoe molding wasn’t going to chop it, so I upgraded to a a lot nicer trim to go alongside the ground. I nonetheless haven’t modified it behind the bathtub. That may require uninstalling the tap and shifting the bath out of the best way, which is exactly why I’ve been placing that off. 😀

So apart from the wainscoting and the second coat of Rubio Monocoat on the storage cupboard, the remaining is only a bunch of small, annoying initiatives that appear like they need to be very fast and straightforward to complete, and but they take up a lot time and make the top of a room rework drag on for what looks as if endlessly.

However, oh my goodness, Monday shall be an thrilling day! Counter tops, then sinks, then plumbing, after which the entire plumbing on this room will really be useful. It’ll really feel like an actual, precise rest room! 😀



Source link